Hello again folks,
I just wanted to check in on the progress of this wish list item, I run into this issue on about half my projects and would love to have this option in the near feature. I'm not if linking the N&E series to work areas will fix all the issues I run into because of how work areas function currently.
Let me provide a somewhat simplified example.
I use one series of N&E points for my site layout (paving corners, paving arc points, building corners, etc) (points 1-18 in Figure A-1). I then skip to a larger number (a new series) for locating playground footings (points 30-39) in the event that I need to add more site layout points. Because my playground layout is on a different sheet, I need to be able to freeze the site layout points (1-18) in my playground layout viewport and vice versa. Sometimes site plans change a little and being able to add a few points to a series without having to jump past a bunch of numbers that were used in another series on a different sheet would be really nice and help with clarity. See Figure A-2 for an example of how I think the series could function.
While Work Areas would fix the series problem, they cause another problem, see below. (in this next example I am using trees to represent Northings and Eastings since Work Areas do not currently apply to N&E)
As they work currently, Work Areas can overlap but don't seem to exclude any items within their area. In Figure B-1 I want my "Site Layout" Work Area to only register points 1-9 (White Oaks/ series A) I also want my "Playground Layout" Work Area to only register points 20-23 (Loblolly Pines/ series B). As it is now, Work Areas will count all items within their area. If work areas are to be used for N&E you would need to be able to select which series you want to be counted by the Work Area. As shown in Figure B-2 it would be nice to apply a work area to a specific series rather than indiscriminately including all points within the work area.
To sum up, here are the features that I believe are needed to solve these issues:
1. Create a group/series option for N&E (which allows for isolating each series and doesn't require me to place the intermediate points out of view)
2. If Work Areas are used, allow them to be exclusive to a single group/series of N&E points (for generation of exclusive point schedules without overlap)
I hope that was clear enough, there's a lot of nuance to this topic and I may not have considered the best solution. Let me know if I need to further clarify any of my points or if I'm misunderstanding how the software works currently.
Keep up the great work, Thanks!