Not really an issue here. Just a clarifying question from a newbie.
I watched the Hardscapes webinar and am trying to get a better understanding of RefNotes. My goal is to prepare a hardscapes drawing for my builder. If I understand things correctly, I should do it like this:
--Create a new DWG (sheet) and Xref my base plan and hardscapes plan in.
--Create RefNotes in the manager as needed
--Place the RefNotes into the NEW sheet (not the original hardscapes drawing)
--Place Callouts in the new sheet
--Generate a RefNotes schedule
Is that the best practice for creating this type of drawing? Or, should I be placing the RefNotes directly on the ORIGINAL hardscapes drawing?
Thanks!