We have a project in which we would like to analyze the hydraulics (pressure loss) connecting at a different location. We have Meter, backflow, MV/FS and Booster Pump coming into a Tee to the rest of the mainline and would like to move that whole manifold further east along the mainline. Since we have run lateral and mainline sizing, what is the best way to move this equipment without losing data integrity.