I have two projects in which I would like to generate one plant schedule, to include placed plants from both projects. Is this possible? These projects are being submitted as one application and I would like to have one, combined plant schedule shown.
I have project 1 xrefed into project 2 and would like to generate a plant schedule in project 2's base dwg. Project 1 is assigned to L/X Project A and Project 2 is assigned to L/X Project AB. Project 2's plant manager was imported from Project 1 and then expanded upon.
Any ideas or tips?
I have project 1 xrefed into project 2 and would like to generate a plant schedule in project 2's base dwg. Project 1 is assigned to L/X Project A and Project 2 is assigned to L/X Project AB. Project 2's plant manager was imported from Project 1 and then expanded upon.
Any ideas or tips?