By Wes Quayle on Monday, 11 June 2018
Posted in Customization
Replies 1
Likes 0
Views 3.3K
Votes 0
Afternoon,

When creating a Refnotes Schedule is there a way to select more than one division besides selecting all? We typically have the overall schedule added to a schedules page in the drawing package. We will create schedules based on the division from time to time, but this is only done when there is limited space on the titleblock.

The reason I am asking is, even though mulch is not a 'living item' we would like to show this schedule on the planting plan.

I would like to be able to create an overall schedule but not have the division that we have placed the mulch in show up in the overall schedule.

Thank you,

Wes
Wes,

We plan on having the Plant Schedule able to include various RefNote items as desired -- mulch, decomposed granite, tree grates, landscape edging.

There is separately a wishlist item to enable the RefNote schedule to include multiple divisions, but this can easily enough be handled by generating the additional division schedules without a title.

--J
·
6 years ago
·
0 Likes
·
1 Votes
·
0 Comments
·
View Full Post