Error: Valves Called Out – 0 Valves Have Not Been Called Out (Using the Verify Mainline Tool)
Issue
You ran our Verify Mainline tool and received one of the following error messages:
Error: Valves Called Out:
0 valves have not been called out.
or
Error: Items Called Out:
0 items have not been called out.
Cause
You might receive this error in a plan where you've labeled one pipe sleeve, but not others. The system will want you to have labeled all pipe sleeves if you've labeled one, which is what triggers the error.
Solution
You can correct the error by either:
- Labeling the rest of the pipe sleeves in your plan, or
- Deleting the existing pipe sleeve label