I'm sure it's a lot more complicated than I think, but it would be great if callouts were scheduled by arrow point and not block locations. I have a design with work areas and lots of callouts but when I run a schedule for a specific area the schedule includes a lot of notes that don't actually belong to that area simply because a callout from a different area overlaps into it. Hopefully that makes sense.
At least this is what appears to be happening.
At least this is what appears to be happening.
There are no replies made for this post yet.