How do we import work areas and UCS's from one drawing to another? For instance, if we've set up 30 sheets (work areas) and associated UCS's in the planting plan, how do we bring those into the the irrigation and construction sheets?
And, on a similar vein, what if a separate drawing includes only the work areas and associated UCS's (it could also include match lines or other common elements)? Then any drawings that reference that master drawing could use those xreffed work areas and UCS's.
And, on a similar vein, what if a separate drawing includes only the work areas and associated UCS's (it could also include match lines or other common elements)? Then any drawings that reference that master drawing could use those xreffed work areas and UCS's.
Steve Cook
set the type of the post as
Issue — 2 years ago
Steve Cook
selected the reply #4974 as the answer for this post — 2 years ago
- Page :
- 1
There are no replies made for this post yet.