Wednesday, 01 March 2017
  5 Replies
  3.9K Visits
0
Votes
Undo
I'd like to be able to show both Potable Water Pipe and Recycle Water Pipe on the same plan. No problem there, crated a new linetype with "RW" for the recycled mainline and the Potable is shown as dashed. The issue is that the Schedule only shows the Potable pipe. It doesn't account for the Recycled Water pipe and leaves it off the schedule.

I've attached a screen shot of what I've done. The pipe to the left is both the recycled and potable pipes. The right side is what the irrigation schedule has populated.
7 years ago
·
#947
0
Votes
Undo
Rob,
Thank you for sending in your files. Based on our conversations through our tech support channel, we are looking into why your file is having a hard time registering the second pipe class linetype. As we discussed, try starting a fresh project and place a few types of mainline (setting one of the classes to the RW linetype) and run a schedule there. We will continue this conversation in our tech support ticket channel.
I'm having a similar problem, too. You've got my ticket already.....

Just mentioning this here so others can see that this is not isolated.

Thanks!
7 years ago
·
#1461
0
Votes
Undo
I'm having this problem too...how was it solved?

I changed the settings for class two mainline, but in the legend it is the same PVC schedule 40 as the first one.
Meredith,

You can use the Tech Support feature in the software to send the project data in to us, and we can see what is going on.

--J
Rob,
It was great hanging with you this weekend!
Are you going to the ASLA show? I hope to see you at the LandFX LA Confidential party on Saturday.
Seaweed
  • Page :
  • 1
There are no replies made for this post yet.